
Impossible Repairs (2021) : 3x2
Overview
Mike Davidson works with the teams at the enormous Port of Savannah to fix the machines that keep this place running. Boasting multiple massive cargo terminals, an impressive mega-railway system and some of the biggest ship-to-shore cranes on earth, the massive operation relies on its hard hat heroes to keep things running safely and smoothly. Major upgrades are taking the port’s container ship operations to a whole new level, and Mike’s on the team. He works with specialized crews to lift and move three, retired three-million-pound cranes to make room for even bigger ones, while digging in with crew on major repairs to other cranes, vehicles and machines that keep goods flowing. The shipments of essential goods flowing through the port never stops, and neither does the pressure to get these machines back up and running and this port functioning.
-
3 - 1US Coast Guard: Safeguarding The Seas June 23, 2024
-
3 - 2Savannah: Mega Cranes & Mega Moves June 30, 2024
-
3 - 3Cirque Du Soleil: High-Flying Fixes July 07, 2024
-
3 - 4Water Bombers: Fixing Aerial Firefighters July 14, 2024
-
3 - 5Fixing For A Fight: U.S. Army Mega Repair Base July 21, 2024
-
3 - 6Sealing Nevada's Abandoned Mines July 28, 2024
-
3 - 7US Navy Hovercraft Overhaul August 04, 2024
-
3 - 8Extreme Heights: Rope Access Repairs August 11, 2024